The plan assumes a pace. Can the company take it?

Most value creation plans are sound. What they rarely test is whether the company can absorb them at the speed the model assumes. The ECI measures that, before you sign and after you own it.

An illustrative chart over a hold period. The pace the model assumes rises in a straight line. The pace the company can take rises more slowly and flattens. The gap between the two is where the return leaks.

Execution coherence is how much of a company's speed turns into results, and how much is lost on the way to them. It is a bigger variable in deal outcomes than it looks, because it does not appear in any of the numbers you are already being shown.

A business can have a defensible market, a sound plan and a capable management team, and still return less than the model says, because decisions take longer than anyone assumed, get reopened after they are made, and arrive on top of more change than the company can carry.

None of that is visible in a quality of earnings report.

Where it fits in a deal

There are two moments where measuring it changes a decision. Before you sign, when the question is whether the pace in the model is realistic. And after you own it, when the question is what to fix first.

Five points along a deal, each with firmer evidence than the last. Before you sign, the pre-deal read, two to three weeks. The first ninety days after close, the integration read. The ninety-day Build. The re-read at day ninety. Then the same read at the same point in each hold period, giving evidence at exit.
Illustrative. The evidence gets harder as the records arrive.

The two reads

ECI-IVDThe pre-deal readECI-IVThe integration read
WhenA bounded piece of work on the deal timetable, written for an investment committee rather than for a management team.Run in the first ninety days after close, when the records exist and the measurement can be properly made.
The questionCan this company absorb the integration, the buy and build, or the growth plan this deal needs, at the pace the return model assumes? And if not, which of the four dimensions is the reason?The plan is now yours. Which of the four dimensions is going to stop it landing, how big is that, and what is the order to address it in?
What you get
  • A scored read across the four ECI dimensions, with the evidence grade shown against each one, so you can see what rests on records and what rests on judgement.
  • The dimension most likely to constrain the plan, with the reasoning set out.
  • What that implies for the first hundred days, and for the pace assumptions in the model.
  • A short written opinion an investment committee can read as a paper, not a deck to be walked through.
The full Baseline, scored and banded across the four dimensions, at company level and for each leadership team taking part. The dimension holding the others back. What it is costing, mapped through to where it shows up financially: delayed revenue, margin lost to rework, capital deployed without compounding, timing risk on commitments already made. And a route for the next ninety days.
What it takesTwo to three weeks. A session with the management team, and access to whatever the data room holds on decision records, approval trails, plan against actual, and the initiative portfolio.Scoped like any Baseline, to the size of the company and the number of leadership teams taking part.
Limits and next stepWhat limits it, stated plainly. Pre-deal you do not get the records. Most of a pre-deal read therefore rests on sessions and on what the data room holds, which is judgement and proxy rather than hard measurement. We grade every part of the score accordingly and the grade travels with the number, so nothing is presented as harder than it is.Where it leads. The 90-Day Coherence Build moves the constraint, and the same measures are re-taken at day ninety so you can see whether it worked rather than agreeing that it felt better. How the Build runs.

An adviser who offers you a confident pre-deal score on this without the records is offering you an opinion wearing a number.

What the read looks like

Scroll to see the full readout →

An illustrative ECI Baseline readout An example first page of a Baseline readout, showing four dimension scores with their bands and the strength of the evidence behind each, the dimension holding the others back, what it is costing, and what would be instrumented next. The numbers are illustrative and are not a client’s data. Execution Coherence Baseline Board readout, page one ILLUSTRATIVE · NOT A CLIENT’S DATA THE PICTURE · SCORED OUT OF 100 Decision Velocity 61 Amber · Evidence A, from your records Decision Adherence 38 Red · Evidence A, from your records Throughput Efficiency 54 Amber · Evidence B, proxy measure Change Load Saturation 47 Amber · Evidence C, from the room Scores are shown with the strength of the evidence behind them. Nothing is presented as harder than it is, and no team is ranked against another. THE DIMENSION HOLDING THE OTHERS BACK Decision Adherence Decisions are being made, then quietly reopened. The cost is paid twice, before delivery even starts. WHAT IT’S COSTING Around a third of material decisions are reopened within ninety days. The cost sits in governance, not delivery, so it shows up as delay rather than spend. Throughput will not improve while this holds, whatever is done to the delivery machine. WHAT WE WOULD INSTRUMENT NEXT Change Load Saturation currently rests on judgement rather than records. Moving it onto your portfolio data would change the picture most.
An example, with invented numbers. Yours would carry your dimensions, your evidence grades, and your constraint.

Across the portfolio

The version of this that matters most is the one that runs more than once.

Measured the same way across several companies, execution coherence becomes something you can act on at portfolio level rather than company by company.

Which assets are carrying more change than they can absorb.

Where a bolt-on is about to land on a company that cannot take it.

Which management teams are spending their own time settling arguments that should never reach them.

Run at the same point in each hold period, it also becomes evidence. A documented improvement in how well a company turns decisions into delivered results is part of the story at exit, and unlike most operational improvement claims it has a number attached and a method behind it.

We would rather start with one company than with a portfolio. One read, done properly, tells you whether this is worth repeating.

Where this sits next to the diligence you already run

  1. Commercial diligenceIs the market there?
  2. Financial diligenceAre the numbers real?
  3. Operational diligenceDoes the machine work?
  4. The ECICan the company decide and act at the speed the plan assumes?

None of them tests whether the company can decide and act at the speed the plan assumes, which is a different property and often the binding one. A business can pass all three and still miss, because the constraint is not the market, the numbers or the machine. It is how long a decision takes, whether it holds once made, how much work gets redone, and how much is already running.

This does not replace any of them. It measures the thing they leave out.

What we will not do

No league tables across your portfolio.

Companies are never ranked against each other, and we will decline the request when it comes. Ranked scores stop measuring anything within one cycle, because everyone learns what a good answer looks like. That holds across a portfolio exactly as it holds across teams inside one company.

No scoring of individuals.

This measures how decisions travel, not who is good. It is not an input to a management change, we will not present it as one, and we will say so to the management team before they take part. If they think the instrument is a personnel exercise they will answer accordingly and the number will be worthless to you.

No score without its grade.

Every part of the read carries where it came from. You will always know which parts are hard and which are judged.

What makes the ECI different

The ECI is new, and we are building a benchmark database as more teams take part.

Over time this will show how you compare with others. For now, we focus on what you can act on today: where this company's speed goes, how we know it, and how sure we are of each part.

The instrument is new. What it measures is not.

It comes out of The Stillness Dividend (2026) and a working paper published on SSRN, Protecting Organisational Judgement Under AI Acceleration, and out of two careers spent watching the distance between what was agreed in a room and what turned up in the quarter.

When it is not the right thing

On a very short fuse. If the exclusivity window is measured in days rather than weeks, a pre-deal read is not going to be worth what you pay for it. Say so and we will tell you the same.

When the thesis is the asset, not the execution. If the return comes from multiple arbitrage, a refinancing or a carve-out where the operating plan is somebody else's problem, this measures something you are not relying on.

When you already know. If the deal team has held this asset before, or has a clear read on the management team's ability to execute, you may not need the measurement. Go and act.

Investment

£15,000The pre-deal read starts here, scoped to the size of the company and the number of sites or divisions in play
2 to 3weeks for a pre-deal read, on the deal timetable
1week or less to start a pre-deal read. Tell us the timetable on the first call
£0for the first conversation, where we work out whether this is worth doing at all

Post-close work is scoped like any Baseline, to the size of the company and the number of leadership teams taking part.

Common questions

How quickly can you start?

On a pre-deal read, within a week. Tell us the timetable on the first call and we will say honestly whether we can meet it.

Do you need management to co-operate?

Yes, for a session. A read built entirely from the data room is possible and is worth much less, and we would tell you so in the write-up rather than quietly.

Is this an engagement survey?

No. Engagement surveys ask people how they feel about working there. This measures how well the company turns decisions into delivered results.

Can we run it ourselves across the portfolio afterwards?

That is a legitimate outcome and the method is written to support it. Some clients take the measurement and run the improvement work with their own people.

Who created it?

Alice Phillips and Rob Anderson, authors of The Stillness Dividend. The ECI also appears in the SSRN working paper Protecting Organisational Judgement Under AI Acceleration.

The pace is an assumption. It can be measured.

Every model has a pace in it. Very few deals test whether the company can take it.